Where It Is Used
- Pipeline AC mitigation and grounding mat layouts
- Casing protection and localized corrosion control
- Right-of-way grounding and CP upgrades
- Project-specific zinc ribbon layouts by engineer specification
Information Needed
- Pipeline project specification or MTO
- Ribbon cross section and total required length
- Coil length, packing method, and destination port
- Backfill, cable, and inspection document requirements
Why Buyers Ask for Documents
- Engineering review before order approval
- Internal comparison against ASTM or project specifications
- Export packing and receiving inspection planning
- Traceability and material certificate requirements
AC Mitigation RFQ Checklist
| RFQ Item | Recommended Detail | Notes |
|---|---|---|
| Application | AC mitigation, grounding mat, casing protection, or pipeline CP. | Helps match the quotation to the real project use. |
| Ribbon requirement | Cross section, coil length, total length, packaging. | Coil handling and packing affect quotation and shipping. |
| Documents | Datasheet, composition, COA/MTC, dimensional report. | Specify before quotation if required by project owner. |
Send AC Mitigation Zinc Ribbon RFQ
Send size, total length, standard, packing, and destination port. Attach drawings or MTO files by email if needed.
